Processing Key Points of Shanghai Packaging Mold Factory

来源:广州海澜汽车配件有限公司 发布时间:2019-04-22 点击次数:

     ShanghaiXinyun Plastic Products Co., Ltd. is a private enterprise specialized in the production of plastic products.It is a solution supplier of plastic matching products, which integrates mould development, injection processing and plastic products.ShanghaiXinyun Plastic Products Co., Ltd. is located in Sigang Town, Songjiang District, Shanghai. It is located in the southwest of Songjiang District, Shanghai. It is adjacent to G60 (former A8 Shanghai-Hangzhou Expressway) G1501 (former A30 and three expressways). It has convenient transportation and superior logistics conditions.However, for plastic parts with high precision, such as electronic products shell, attention should be paid to the precision requirement from the beginning of mold manufacturing.
    
     The main processing points of gas used in rapid variable temperature injection moulding in Shanghai wrapping mould factory are compressed hot air method, steam heating method and flame heating method. Except for different gas sources, the principles of the three methods are similar. The compressed hot air is pre-heated by injecting compressed hot air into the cavity before injection, and the air is drawn out through the exhaust port.Gas, then close the compressed hot air, extract true, inject, the preheating temperature of the die wall is controlled by the preheating layer, the thickness of insulation layer, the temperature of compressed hot air, pressure and heating time. In the case of complex cavity and low forming material, the composite die wall can not be used, and only compressed hot air is used for heating.
    
     In injection production, the cooling time of plastic injection parts accounts for about 80% of the whole injection production cycle.Poor cooling often leads to warpage or surface defects, which affect the dimensional stability of products.Reasonable arrangement of injection, holding pressure and cooling time can improve product quality and productivity.In injection moulding, the gating system and the cavity are formed by the closure of the movable and fixed moulds, and the movable and fixed moulds are separated when the moulds are opened to remove the plastic products.In order to reduce the heavy workload of mold design and manufacturing, most injection moulds adopt standard mold base.
    
     After the plastics are heated in the barrel of the injection machine and the plasticization reaches the flowing state, the injection process can be divided into five stages: filling, compacting, holding, backflow and cooling.Injection moulding is a batch process of injection moulding, so it needs filling preparation period, also known as screw no-load period, equivalent to the period from t0 to tA.The screw starts to move forward at t0. Because it takes a certain time to flow through the nozzle and the gating system, the melt has not entered the die cavity before tA. Because the melt passes through the nozzle and the runner with very small cross-section at high speed, it suffers great flow resistance and generates a lot of shear friction heat.
返回列表

上一篇:Practice of CAAC International Manufacturing Technology in the Field of Aviation Intelligent Manufacturing

下一篇:没有了

相关推荐:



广州海澜汽车配件有限公司的产品都通过了国家3C认证。汽车仪表台横梁支架总成、汽车制动离合踏板总成等冲压、钣金、焊接件也都采用自动装夹、机器人自动焊接工艺,所有部件装配优先采用自动流水线生产。产品外观也根据客户要求实现多样化,区别化处理。我公司生产的不锈钢输送器在国内炼钢行业属于较高水平。主关键词:汽车配件公司,大众汽车配件,广州汽车配件